![]() |
© 2012 SMS Siemag AG All rights reserved Reproduction only with the permission of SMS Siemag AG, Düsseldorf |
Switch on earlier, go into operation earlier
Test earlier. Plug & Work makes a major contribution to a faster production start, more efficient commissioning, and an early return on investment. Here’s how it works. Long before commissioning, we install the entire automation system of your plant in our test center – from the control desks to the software. Using a simulation system based on the design data of your plant, we exhaustively test the entire electrics and automation. As a result, we optimize your system even before commissioning.
Train earlier. This also means your staff can train in advance on the concrete plant in a realistic situation. Simultaneously, we erect the mechanical plant parts in your works. As a result of this efficient preparation, Plug & Work ensures you achieve full production earlier.

Glossary Overview
